Opportunities: I. Request for Proposal (RFP) – Training and Capacity Building in the areas of ESG and sustainability. For more information click here. Last date: September 16, 2024.      ||      II. Request for Quote (RFQ) – Optimum utilisation of Indian Railways (IR) Rooftop Solar (RTS) assets by integrating this with Auxiliary transformer of traction supply. For more information click here. Last date: September 17, 2024.     ||      III. Request for Expression of Interest (RFEI) – Oversee state-level technical interventions and manage implementation of activities. For more information click here. Last date: September 26, 2024.

Gender Green Finance

Knowledge Library Sector - Green Finance

Presentation on Electricity Generation Planning in South Asian Countries and perspectives for clean energy transition and advancing Cross Border Energy Trade in South Asia – India Perspectives

To obtain an optimal generation capacity mix in the least cost manner to meet the demand at every instance of time while ensuring the..

Download:

Presentation on Overview of Generation Planning in Sri Lanka – Sri Lanka Perspective

Identifying the most suitable generating capacity mix and required grid support interventions to meet the forecasted demand for electricity at lowest economic cost while..

Download:

Presentation on Electricity Transmission Planning in South Asian Countries and perspectives for clean energy transition and advancing Cross Border Energy Trade in South Asia – Bhutan Perspectives

There is immediate need of 400kV interconnecting feeders with India from Eastern Bhutan, in addition to existing 132kV line..

Download:

Presentation on Electricity Transmission Planning in South Asian Countries and Perspective for Clean Energy Transition through Regional Grid Interconnections – India Perspectives

As per provision of Electricity (Planning, Development and Recovery of ISTS charges) Rules 2021 , the CTU shall also prepare a five-year rolling plan..