South Asia Clean Energy Forum (SACEF) 2024.   Register here      ||      Inviting applications for the SAREP Grants Annual Program Statement (APS) – FY2024. For more information click Here.
Opportunities: I. Request for Proposal (RFP) – Training and Capacity Building in the areas of ESG and sustainability. For more information click here. Last date: September 16, 2024.      ||      II. Request for Quote (RFQ) – Optimum utilisation of Indian Railways (IR) Rooftop Solar (RTS) assets by integrating this with Auxiliary transformer of traction supply. For more information click here. Last date: September 17, 2024.     ||      III. Request for Expression of Interest (RFEI) – Oversee state-level technical interventions and manage implementation of activities. For more information click here. Last date: September 26, 2024.

2016

January 3, 2022
Harmonization of grid codes in South Asia

Harmonization of grid codes in South Asia

Review of the Grid Codes of the respective South Asia nations covering procedures/codes/standards such as Power system operating procedures, protection code, metering code, connection code, planning code, system security, demand estimation systems, outage planning, recovery procedures etc.
January 3, 2022
bangladesh

Brief Report on SARI-EI Technical Delegation to Bangladesh

There are already CBET between India Bhutan ,India -Nepal India-Bangladesh.These CBET trades are bi-lateral nd limited in transaction vis the huge CBET potential that exists in the SAR
January 3, 2022
SAARC

Regional Regulatory Guidelines & Harmonization of Grid Codes, Operating Procedures, Standards for promoting Cross Border Electricity Trade in South Asia Region

The guidelines deal only with limited areas where need for such common guidelines has been felt by the SAC and are not meant to be comprehensively dealing with all matters related to CBET.
January 2, 2022
Ei technical

Brief Report on SARI/EI Delegation to Bhutan to meet and discuss with critical stakeholders such as Bhutan Electricity Authority, Bhutan Power Corporation, Bhutan Power System Operator and Department of Hydro Power System, Ministry of Economic Affairs on the SARI/EI Task Force- 2 Study on “Harmonization of grid codes, operating procedures and standards to facilitate/promote Cross Border Electricity Trade in the South Asia Region”

In order to bridge the demand, supply gap, Cross Border Electricity Trade (CBET) has emerged as viable and economical option and various steps are being taken in advancing CBET in the South Asian Region (SAR)
January 2, 2022
bhutan

Brief report on SARIEI Technical Delegation visit to Thimpu, Bhutan

There has been an unprecedented growth in electricity demand in South Asian countries in the last decade. All South Asian countries are looking for alternate ways to meet this ever growing demand of electricity as this is the backbone of the economies of South Asian Countries (SAC).
January 2, 2022
report

Brief Report on SARI/EI Delegation to the Second Meeting of SAARC Energy Regulators for Presenting on the SARI/EI studies a) Regional Regulatory Guidelines and b)Harmonization of Grid Codes, Standards and Operating Procedures for Promoting Cross Border Electricity Trade (CBET) in South Asia

Key Findings of the SARI/EI Study on a) Harmonization of Grid Codes, Operating Procedures, Standards for promoting Cross Border Electricity Trade (CBET) in South Asia Region and b) Regional Regulatory Guidelines (RRGs) were presented during the meeting. Members acknowledged and appreciated the work being carried out by SARI/EI.
January 2, 2022
brief report

Brief Report on SARI-EI Delegation to the 2nd Meeting of SAARC Energy Regulators

There was a consensus among the members to create a Regional Regulatory Institutional Mechanism and members agreed to create a Forum of South Asia Energy (Electricity) Regulators.
January 1, 2022

Review of SARI-EI activities, Key Findings of Demand Driven studies & Key Achievements in the year 2015-16

5th Meeting of Project Steering Committee-Maitland State Room Mount Lavinia Hotel, Colombo, Sri Lanka 9th and 10th November,2016
January 1, 2022

Annual Work Plan for 2016-2017 and Strategies for synthesis of SARI-EI recommendations-Preparation of Combined task force Report

5th Meeting of Project Steering Committee-Maitland State Room Mount Lavinia Hotel, Colombo, Sri Lanka 9th and 10th November,2016
January 1, 2022

Overview of SARI/EI program, key achievements & way forward-USEA Training Program on Techno-economic Hydro Power Project Appraisal NPTI

5th December 2016 , Workshops & Conferences