Indian Railways Global Ceiling Fan Competition      ||      Clean Energy Investment Facilitation Platform      ||      South Asia Clean Energy Forum (SACEF) 2024      ||      Inviting applications for the SAREP Grants Annual Program Statement (APS) – FY2024. For more information click Here.
Opportunities: I. Request for Proposal (RFP) – Bhutan Power System Operator (BPSO) e-Monitoring Digitalization Solution. For more information click here. Last date: January 20, 2025.      ||      II. Request for Proposal (RFP) – Provide Technical Services to Support the Saturation of Government Buildings with Rooftop Solar in Haryana. For more information click here. Last date: January 31, 2025.

Strengthening Transmission Utilities and System Operators

January 11, 2022
Gains from Nepal-India CBET

Gains from Nepal India CBET

A macro-economic SAM based model covers the whole economy balances supply and demand for each sector, also investment and savings, balance of payment for each year, etc.
January 11, 2022

Mediratta Workshop Bangladesh

Exchanges in India offers standardised contracts and competitive platform and allow market based price discovery. Governing regulations and policy development are still at nascent stage in many countries, this will allow other countries to align the relevant rules for development of a harmonized market.
January 4, 2022
sari

Brief Report -SARI-EI participation as Resource Person in SAARC Dissemination Workshop on Regional Hydro Power Plant in South Asia-Kathmandu

Based on the invitation from SAARC Energy Centre of South Asia Association of Regional Cooperation, Mr. Rajiv Ratna Panda, Head-Technical, SARI/EI/IRADe participated in the SAARC Dissemination Workshop on “The Study for Development of Potential Regional Hydro Power Plant in South Asia” held on 09th -10th May, 2016 at Hotel SoalteeCrowne Plaza, Kathmandu, Nepal.
January 3, 2022

Cross Border Electricity Trade in South Asia, Overview of SARI/EI Program, Progress, Key Achievements and Way Forward

2nd November 2016 , Workshops & Conferences
January 3, 2022

Role of SARI in Capacity Building in South Asia

January 3, 2022

New SARIEI program to Support Power System Modeling, RE Development, Contingency Recoveries

5th Meeting of Project Steering Committee-Maitland State Room Mount Lavinia Hotel, Colombo, Sri Lanka 9th and 10th November,2016
January 3, 2022

Analytical Studies -Gains from Nepal-India CBET

5th Meeting of Project Steering Committee-Maitland State Room Mount Lavinia Hotel, Colombo, Sri Lanka 9th and 10th November,2016
January 3, 2022
POSOCO

SKSoonee POSOCO SARI/EI Workshop Bangladesh

Medium Term, Long Term, Grant of Access, Protection Coordination, Standards, Metering Security, Reliability, Scheduling, Despatch, Congestion Mgmt., SCADA/EMS, Ancillary Service.
January 3, 2022

TF-1 Report Suggested Changes Amendments in Electricity Laws, Regulations and Policies of SAC for Promoting CBET in SA Region

South Asia Regional Initiative for Energy Integration (SARI/EI) a program of USAID being implemented by IRADe aims to “Promote integration of Energy Systems and o enhance Cross-Border Electricity Trade (CBET) among the South Asian countries.
January 3, 2022
Competitive Bidding Framework in India

Competitive Bidding Framework in India

Incomplete Works, including any shortfall in Contracted Capacity or Station Heat Rate, to be completed within 180 days. For further delay, Damages for each day at the lower of 0.1% of the Performance Security and 0.2% of the cost of completing such items as estimated by the Utility’s Representative.
January 3, 2022
Ravi Shankar Bangladesh Workshop of IRADe 2104016

Ravi Shankar Bangladesh Workshop of IRADe 2104016

Provided that such open access may be allowed before the cross subsidies are eliminated, on payment of surcharge in addition to the charges for wheeling as may be determined by the State Commission.
January 3, 2022

Brief report on the workshop on Power Markets Development

At the bequest of Power Divison (under MPEMR), the workshop was held to share the lessons and learning from the volution of Indian Power Sector covering key laws, policies and regulations, besides the role of Transmission Agencies and Power Exchanges in the development of Indian Power Market. The workshop was held at Mukti Hall, Bidyut Babhan (Power Cell premises, Power Division), Dhaka, Bangladesh on 21st April 2016.
January 3, 2022
CEBT

TOR-Scope of Work on developing the Model framework guidelines for Trading License Regime in SAC and for CBET

The BEA issues licenses and monitors the performance of the licensees to ensure compliance with the provisions of Acts, Regulations, Standards, Codes, etc., For instance, the Bhutan Electricity Authority (BEA) has granted license to Dagachhu Hydropower Corporation Limited (or Licensee) to carry out the activities of construction, generation, supply, and export.
January 3, 2022
india

Agenda -Power Market Development in India Key Lessons Learnt – Bangladesh workshop

Indian Power system for planning and operational purposes is divided into five regional grids. The integration of regional grids, and thereby the establishment of a national grid, was conceptualized in the early nineties
January 3, 2022
TOR

TOR-Scope of Work on developing the Model framework guidelines for non-discriminatory open access regime in Transmission in SAC and for CBET

In CBET, non-discriminatory access to their respective transmission systems increases opportunities for any party to sell/buy electricity at a cost-reflective fee and to take advantage of the load and time diversity and contribute to better utilization of resources.